EMS Custom

This large-scale project comprises the main construction works for the deployment of 45 Battery Energy Storage Systems (BESS). The key activities include the delivery, transportation, and joint commissioning of the systems at the respective ASFINAG sites across Eastern, Central, and Western Austria.

The cabling and connection to the existing high-voltage power grid will be carried out by a dedicated installation contractor in accordance with the specifications provided by the supplier.

In addition, the foundations for the containerized solutions will be constructed by the same contractor based on the load specifications supplied by the manufacturer.