Frubona

EMS Custom

  • PV system revamp: 398 kWp

  • Complete renewal of the existing system from 2009

  • New PV system: 540 kWp
  • Installed on additional roof space
  • Battery energy storage system (BESS):
  • > 1,300 kWh capacity and > 300 kW power output
  • EMS: Intelligent control of energy flows to maximize energy self-consumption

Everything from  EnergyOnSite!